Plans009 2026 02 21 Data Quality Pipeline
Review
2026-02-21 21:43 - Checkpoint
Verdict: Aligned Trigger: Phase boundary
Aligned:
- T-003, T-004, and T-005 satisfy Phase 2 YAML goals (year-specific header handling, organizations config, and complete REKAP removal).
- T-006 satisfies schema/type requirements (
schema.tsconstants plusSourceFileConfigextensions fortype,merge_header_rows, anddata_start_row). - Boundary compliance maintained: Progress entries were appended per completed task and
pnpm --filter @packages/pipeline test:typewas run after TypeScript changes. - Non-goals respected: no orchestration, EPN, or REKAP extraction work introduced.
Patterns:
- Year-specific header rules are applied consistently across 2023, 2024/2025, and 2026 config updates.
- Configs are converging toward explicit typed dispatch (
typemetadata), which supports upcoming extract/load refactors.
Recommendations:
- In T-007/T-009, enforce the
intakecanonical field decision to avoidmonth_intakeschema drift. - In T-011/T-014, remove remaining
marketing_activitylegacy surfaces so code matches YAML end-state.
2026-02-21 22:17 - Checkpoint
Verdict: Minor Deviation Trigger: Phase boundary
Aligned:
- T-007, T-008, and T-009 completed with implementation + tests for reader, referensi unpivot, writer overwrite guard, and extract CLI wiring.
- T-011 completed with CSV-first load path (
read_csv_auto), empty-sheet handling, and removal ofraw_marketing_activitycreation. - Frozen CSV boundary remains compliant and test-backed.
Deviations:
- Boundary evidence for
pnpm --filter @packages/pipeline test:typewas not explicitly recorded per task entry for T-007 through T-011 at first pass.
Patterns:
- Strong implementation-to-test pairing across extract/load modules.
- Plan documentation is consistently updated (Tasks, Progress, Summary) after each task completion.
Recommendations:
- Continue adding explicit typecheck evidence in Progress entries for every TypeScript task.
2026-02-21 22:21 - Checkpoint
Verdict: Aligned Trigger: Phase boundary
Aligned:
- T-012 and T-013 were completed in-scope for Phase 5 and satisfy validate-step goals.
- Progress, Tasks, and Summary states are synchronized (
12/19execution; T-012/T-013 marked completed). - TypeScript boundary evidence is explicit in progress logs for both tasks (
pnpm --filter @packages/pipeline test:type).
Patterns:
- Strong implementation-to-test coupling for validate checks and runner orchestration.
- Consistent compliance hygiene via append-only progress and periodic review checkpoints.
Recommendations:
- Preserve the same boundary evidence pattern for remaining TypeScript tasks.
- For Phase 6 dbt work, explicitly log
uv run dbt run && uv run dbt testevidence per completed task.
2026-02-21 22:26 - Checkpoint
Verdict: Minor Deviation Trigger: Phase boundary
Aligned:
- T-014 through T-018 are completed and in scope for Phase 6 (dead model removal, validity flags, downstream filtering, audit view, schema tests).
- Plan tracking files remain synchronized (
Tasks,Progress,Summary).
Deviations:
- Full dbt boundary evidence (
uv run dbt run && uv run dbt test) was logged at phase end rather than explicitly per individual dbt-changing task entry.
Patterns:
- Verification improved progressively from targeted model runs to full-suite validation.
- Strong append-only task logging discipline was maintained.
Recommendations:
- Keep explicit full dbt run/test evidence near each future dbt task completion point.
2026-02-21 22:28 - Checkpoint
Verdict: Minor Deviation Trigger: Session checkpoint
Aligned:
- T-014 through T-018 delivered with passing dbt run/test and matching plan outcomes.
- T-019 verification/documentation steps are mostly complete (extract, sync, validate, AGENTS updates).
Deviations:
- T-019 format-content validation remains blocked because marts are empty after canonical CSV migration.
- Unblocking appears to require
stg_*SQL alias updates, which are guarded by Ask-first boundaries.
Recommendations:
- Request explicit approval before touching staging SQL to restore mart/format population.
2026-02-22 11:24 - Checkpoint
Verdict: Minor Deviation Trigger: Phase boundary
Aligned:
- T-019a extract formatting/id rename work is implemented and verified (
test:type,test, overwrite extraction across 2023-2026, spot checks). - T-019b staging/intermediate refactor is complete and in-scope (direct canonical refs, identity split fields, staging period parsing, int_orders simplification).
- T-019c end-to-end checks are complete with non-zero marts/report output and passing dbt + pipeline tests.
Deviations:
- T-019a and T-010 remain in-progress only because commit steps are pending; commits were not executed without explicit user request.
Patterns:
- Canonical CSV boundary is now stable: extract handles value normalization, staging handles semantic parsing/translation.
- Verification quality improved by combining command-level checks with direct DuckDB assertions for row counts and revenue presence.
Recommendations:
- Request a single commit operation covering code + refreshed CSV snapshots to close T-010/T-019a.
- Run final plan checkpoint after commit and resolve legacy T-019 status (retain blocked context or cancel).
2026-02-22 11:41 - Checkpoint
Verdict: Minor Deviation Trigger: Manual
Aligned:
- T-010 closure now satisfies the frozen snapshot success target, with committed 2023-2026
@source/clean/outputs merged via PR #19. - T-019a closure remains in-scope for extract quality hardening (
amount/datenormalization andid_rawtransition) and respects extract-vs-staging responsibilities. - Boundary compliance maintained:
Progress.mdwas updated immediately after task completion events and overwrite behavior remained explicit. - Non-goals remain respected (no REKAP extraction, no orchestration expansion, no EPN scope expansion).
Deviations:
Summary.mdwas stale versusTasks.md/Progress.mdat checkpoint start (still showing T-010/T-019a in progress) -> accepted and resolved in this checkpoint by synchronizing Summary.
Patterns:
- Previously noted commit-evidence debt was resolved with concrete Git artifacts (PR #19 and merge commit evidence).
- Task closure evidence is now consistently anchored to auditable artifacts across plan files.
Recommendations:
- Resolve legacy T-019 status (keep historical blocked state or mark cancelled as superseded) before final plan closure.